Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Last revision Both sides next revision | ||
home [2014/08/13 05:40] ecai |
home [2014/08/30 20:38] dianam |
||
---|---|---|---|
Line 9: | Line 9: | ||
- predictive matching of hydrokinetic power generation and time-varying demand in complex river networks with geospatial and temporal dependencies; and | - predictive matching of hydrokinetic power generation and time-varying demand in complex river networks with geospatial and temporal dependencies; and | ||
- climate-aware planning for distributed hydrokinetic power generation resources and avoiding catastrophic events. | - climate-aware planning for distributed hydrokinetic power generation resources and avoiding catastrophic events. | ||
+ | |||
+ | This research is supported by NSF CyberSEES program. More information can be found [[http://nsf.gov/awardsearch/showAward?AWD_ID=1331804|here]]. |